Website RFP: How to Write a Request for Proposal (With Template)

Talha Aslan 24 min read 4 views

Short answer

What is a website RFP and how do you write one?

A website RFP (request for proposal) is a document in which a company describes the goals, scope, technical expectations, timeline, and evaluation criteria of a website project and invites selected vendors to respond. To write one, align your stakeholders first, fill in eleven sections, then send it to a short list of vendors on the same day.

Keep reading for the full details and examples

A website RFP is the document you send when you want several vendors to price the same project, so you can compare their answers side by side. Most buying teams know the opposite situation well, because they have lived it. Three proposals arrive, and no two of them describe the same job. One vendor counted ten pages, another included copywriting, and the third never mentioned maintenance. The vendors did nothing wrong, because the document they received left too much open. This guide shows private sector teams how to build a request for proposal section by section, with a fill-in template and a sample scoring matrix. Public procurement rules are a separate topic, so we do not cover them here.

The document does two jobs. First, it makes vendors price the same work. Second, it forces your own team to decide things. You cannot write the scope section without answering questions such as whether the site needs a blog, who will write it, and which languages you support. In short, a good website RFP collects your internal uncertainty before it collects proposals.

Length does not signal quality. For a mid-sized corporate site, a clear document of a few pages often attracts better proposals than a forty-page file, because vendors can see what matters. The sections below therefore cover what to leave out as well as what to include.

What is the difference between an RFP and a design brief?

A brief is the short document you share with one vendor, or with a team you have already chosen. It carries the spirit of the project: audience, tone, examples you like, priorities. A website RFP is a competitive buying document. It goes to several vendors at once, and it also tells them how to answer. A brief says what you want, while an RFP also covers how vendors should respond and how you will choose among them.

AspectDesign briefRequest for proposal
PurposeGuide a chosen teamCollect comparable proposals from several vendors
AudienceOne vendor or an in-house teamEvery vendor on the short list
Evaluation criteriaNot includedIncluded, with weights
Response formatOpenPrescribed, with a shared pricing table
TimelineProject dates onlyProject dates and selection dates
LengthOne or two pagesA few pages plus appendices, depending on scope

The two documents do not compete. The background and goals section of an RFP is essentially a condensed brief. We cover the brief side in a separate article, so we will not repeat it here. Use the questions in our guide on how to write a website design brief for audience and reference sites, then add the buying layer from this page.

When do you not need a website RFP?

Not every project needs one. If you are building a five or six page brochure site, one person makes the decision, and nothing needs to integrate, a formal process only slows you down. A solid brief and conversations with two or three vendors will do instead. On small jobs, a long RFP can even push good vendors away, because the cost of answering approaches the value of the work.

A website RFP pays for itself in situations like these:

  • Several departments share the decision, for example marketing, IT, and procurement.
  • The site must connect to a CRM, an ERP, a payment provider, or a member system.
  • Multiple languages, countries, or brands will live on one platform.
  • Internal purchasing policy calls for a written comparison.
  • The current site carries years of content and organic search traffic.

Projects in between have a middle path: fill in only the scope, timeline, response format, and evaluation rows of the template. That two-page light version usually gives proposals enough common ground, so nobody has to answer a full questionnaire. Matching the weight of the document to the weight of the project is a quiet decision, and it saves everyone time.

What should you settle internally before you write?

Weak RFPs rarely come from weak writing. They come instead from the internal meeting that nobody held. Before you open a blank document, agree on one answer to each of these five questions:

  1. What is the primary goal you will measure: leads, quote requests, applications, sales, or information?
  2. Who makes the final decision, and how many people sit in the approval chain?
  3. What is the budget range, and in which period will you spend it?
  4. Who will produce the content, and who signs it off?
  5. Who will update the site after launch, and how technical is that person?

Your answers then write half of the document for you. They also keep disagreements from surfacing in the middle of a vendor meeting. In our experience, a large share of project delays starts with unclear approvals on the client side, not with the vendor.

One thing helps to accept early. A website RFP does not replace the discovery phase that good web design services begin with; it only opens the door to it. You will then revisit every line with the vendor you select. Your aim is therefore not to solve every detail in advance, but to give vendors enough clarity to ask the right questions.

What sections belong in a website RFP?

A solid website RFP has eleven sections. The order matters, because vendors read from top to bottom and each section prepares the ground for the next.

  1. Company and goals: who you are, the business goal of the site, how you will measure success.
  2. Scope: what the project includes and what it explicitly excludes.
  3. Page types and features: templates, functions, priority levels.
  4. Integrations: the systems the site must talk to and the direction of the data.
  5. Content responsibility: who handles copy, visuals, translation, and migration.
  6. Technical and security expectations: platform constraints, performance, data protection.
  7. Accessibility: the standard you target and how the vendor will verify it.
  8. Maintenance and handover: support after launch, warranty, ownership.
  9. Timeline: dates for both the selection process and the project.
  10. Evaluation criteria: the scoring categories and their weights.
  11. Response format: the structure and the pricing table you expect back.

We walk through each section below, with notes on what to put in it. You do not have to complete all eleven. Still, for every heading you leave empty, ask yourself whether you skipped it on purpose.

How do you write the company background and goals?

Keep this section to half a page. Vendors do not need your company history, because their real question is which business problem the site should solve. Three short paragraphs will do: what you sell and to whom, why the current site falls short, and which measurement will tell you the new one works.

Write goals as behavior, not as adjectives. A phrase such as “a modern, professional site” gives vendors nothing to design against, so each one fills the gap with personal taste. Compare that with “dealer candidates complete the application form” or “engineers find a data sheet in three clicks.” Those statements steer design decisions. For example, an application goal points the vendor toward form flow, while an information goal points toward search and navigation.

Describe your audience as two or three visitor types instead of one sentence: a purchasing manager, a technical evaluator, a job applicant. Also name the people involved in approvals. A vendor who knows whether design sign-off comes from one person or from a committee can then plan revision rounds and the schedule far more realistically.

How do you define scope, page types, and features?

The most valuable line in the scope section is the out-of-scope line. If logo redesign, product photography, ad management, or a mobile app do not belong to this project, say so plainly. Otherwise one vendor prices them, another does not, and the proposals drift apart again.

Think in page types instead of page counts. A hundred product pages share one template, because they all follow the same layout. A home page, a product detail page, a dealer locator, and a careers page are four separate design jobs. Vendor effort therefore depends on the number of templates and functions, not on the number of URLs.

Split your feature list into three priority levels:

  • Must have: the site cannot launch without it.
  • Should have: it goes into the first release if budget and schedule allow.
  • Later phase: you will not build it now, but the platform should not block it.

This split gives vendors room to breathe. If you mark everything as a must, the most honest vendor submits the highest price and drops off your list. It also helps to describe each feature as a need, not as a solution. Instead of naming a specific plugin, write “a visitor finds the nearest dealer by choosing a city.” You will then see how different vendors would solve the same need.

How do you describe integrations and existing systems?

Integrations cause the widest gaps between proposals, because “connect it to the CRM” can mean two hours or two weeks. Give four facts for every connection: the name of the system, the direction of the data, how often data moves, and whether the system has a documented API. An API, or application programming interface, is the door through which two pieces of software talk to each other.

Your current setup also belongs in the document. Which content management system, which hosting, and which analytics and tag tools run on the site today? If nobody in the company remembers, there is a practical shortcut. Open our website technology checker, enter your domain, and copy the detected CMS, server, and script list into a “current state” appendix. That takes less time than emailing a former agency and waiting for a reply.

State what access you can offer, because vendors price what they cannot see. Will the selected vendor receive a test environment, API keys, or sample data? Saying so up front keeps the risk padding out of the price. If a third-party software provider will handle part of the integration, name that provider and draw the line of responsibility. Otherwise each side will expect the other to fix whatever breaks.

Who owns the content?

Content derails web project schedules more often than anything else, and it also gets the least space in most RFPs. Assign four jobs separately: writing new copy, migrating existing content, producing images and video, and translating. For each one, choose a clear option: the client does it, the vendor does it, or the vendor prices it as a separate line.

Give volumes as numbers, because “existing content will move over” tells a vendor nothing. How many pages, news items, products, and PDF files exist? To estimate text volume, paste your longest and your shortest page into a word counter, then multiply the average by the number of pages. That rough figure then gives every vendor the same basis for translation and editing effort.

If your team will write the content, also put a delivery date in the RFP and treat it as real. A designer who works with actual copy gets heading lengths, table needs, and image ratios right the first time. A design approved with placeholder text comes back to the table when the real content arrives, and that moment often starts the first “extra work” debate.

How specific should technical and security requirements be?

The common mistake in the technical section is dictating the solution. If your in-house team knows a particular system, or company policy demands a certain technology, write that down. If no such constraint exists, describe the outcome instead and leave the choice to the vendor. For example: “marketing can add a page without touching code” or “content approval has two steps.” If you cannot decide between an off-the-shelf platform and a custom build, our comparison of WordPress vs custom code will help before you write this part.

Use measurable language for performance. Google's Core Web Vitals measure loading, responsiveness to interaction, and visual stability. You can take the current “good” thresholds from the Web Vitals page on web.dev and then name them as acceptance criteria. Thresholds can change over time, so it is safer to reference the source than to hard-code a number.

Security follows the same logic. If you collect personal data, state where it should live, who may access it, and what backups you expect. For sensitive functions such as accounts or payments, the OWASP Application Security Verification Standard offers a solid reference. Its project page says the standard provides a basis for specifying application security verification requirements in contracts. Our website data security and encryption guide covers the details. Privacy compliance is a legal matter, so treat this article as orientation and not as legal advice.

How do you put accessibility into a website RFP?

Accessibility means people with visual, hearing, motor, or cognitive disabilities can also use the site. Writing “the site should be accessible” does not help, because nobody can test that sentence. Name a standard and a conformance level instead.

The international reference is the Web Content Accessibility Guidelines from W3C, known as WCAG. According to the W3C overview of WCAG, the guidelines rest on four principles: perceivable, operable, understandable, and robust. Testable success criteria come at three levels: A, AA, and AAA. W3C also encourages teams to use the latest version. Many corporate RFPs therefore name level AA of the current version as the target.

After you name the target, ask for evidence:

  • Which tools does the vendor use to test accessibility, and at which stage?
  • Does acceptance testing include keyboard navigation and a screen reader pass?
  • Who checks color contrast and form error messages during design?
  • Will the vendor deliver a report that lists the pages it audited?

We explain what the levels cover in our article on web accessibility and WCAG standards. Legal duties differ by country and sector, so no single sentence fits every company. If you serve customers in the European Union, our piece on whether the European Accessibility Act applies to your website gives a starting point. Confirm your own obligations with official sources or legal counsel.

What should you ask for if you are replacing an existing site?

If the new site replaces an old one, ask vendors to treat search visibility as its own line item. Most proposals leave it out, so teams tend to notice only after launch. Google's documentation on site moves with URL changes describes the work in five steps: prepare the new site, map old URLs to new ones, set up permanent server-side redirects, start the move, and monitor traffic.

Your RFP expectation mirrors those steps. Ask each vendor to state who builds the URL mapping, who tests the redirects, and how long monitoring continues after launch. The same Google document advises against redirecting many old pages to one unrelated page, such as the home page. A proposal that suggests sending every old address to the home page therefore tells you something about the vendor.

The technical detail deserves its own guide. Our article on redesigning a website without losing SEO rankings lists the title, content, and redirect checks step by step. In the RFP, you only need to name an owner for this work and the proof you expect at handover.

Maintenance, warranty, and ownership expectations

Launch day does not end the project; it starts the life of the site. Ask about life after launch under three headings, because each one hides a different cost. The first is warranty: for how long, and under what conditions, does the vendor fix defects at no charge? We discuss the line between a bug and a new request in our article on warranty, bug fixes, and paid changes after launch. Ask each vendor to describe that line in its own words.

The second heading is maintenance. Does the vendor offer a monthly or annual plan for updates, backups, monitoring, and small content edits, or does it bill by the hour? Ask for maintenance on a separate line from the project fee, so you never mix the two figures. For a sense of what belongs under maintenance, see our monthly website maintenance checklist.

The third heading is ownership and handover. Who holds the source code, design files, domain, hosting account, and admin credentials? If the build relies on licensed themes, plugins, or stock images, whose name is on the license? These questions become binding at contract stage, and our guide on what to include in a web design contract covers the clauses. Have your attorney review the contract text, because this guide is not legal advice.

Timeline and budget: should you disclose your budget?

The timeline section needs two schedules. First, the selection schedule lists the issue date, the deadline for questions, the proposal due date, the presentation week, and the decision date. Second, the project schedule states the target launch date and any event you cannot miss, such as a trade show or a product launch. If the launch date is flexible, say that too, because vendors find it easier to commit their best people to a flexible plan.

Budget is the more disputed topic. Many companies hide it, because they fear that every vendor will simply quote that figure. A missing budget, however, forces vendors to guess. One imagines a small site, another imagines a full platform. The gap between proposals then comes from different assumptions, not from different prices, and comparison becomes impossible again.

If you prefer not to share an exact figure, give a range or a ceiling instead. Vendors will then compete to design the best solution inside that limit, and you will see several answers to the question “what can this budget buy?” If you struggle to set a range, you have two honest options. Ask a peer who commissioned a site of similar size, or ask short-listed vendors for a rough band before you issue the website RFP. Neither step commits anyone.

A fill-in website RFP template

Copy the table below into your document and replace the sample wording in the third column with your own answers. The questions in the second column remind you what each row needs.

SectionQuestion to answerSample wording
Company and goalsWhat is the primary business goal and its measure?Dealer application form; applications per month
ScopeWhat is in, and what is explicitly out?Design and development in; logo and photography out
Page types and featuresHow many templates, which functions, which priority?Seven templates; dealer locator must have, live chat should have
IntegrationsWhich system, which direction, any API?Form data to CRM, one way, documented API available
ContentWho handles copy, migration, visuals, translation?Copy by client; migration and Spanish translation by vendor
Technical and securityAny constraints, performance and data expectations?No-code page editing; Core Web Vitals in the “good” range
AccessibilityWhich standard, which level, which evidence?Current WCAG version, level AA; audit report at handover
Maintenance and handoverWarranty, maintenance plan, ownership?Warranty terms in proposal; code and accounts with client
TimelineWhat are the selection and project dates?Decision at month end; launch two weeks before trade show
EvaluationWhich criteria, which weights?Six-criteria scoring matrix
Response formatWhat structure should the answer follow?Shared pricing table, page-limited proposal

The sample wording only shows the form, so your own answers will differ. Once you complete the table, you hold a core document of two or three pages. Attach the rest as appendices, for example the current sitemap, brand guidelines, and integration documentation. Keep appendices out of the body, because vendors read the core first and turn to the attachments when they need them.

Evaluation criteria and a sample scoring matrix

Publishing your evaluation criteria focuses vendor answers on the topics that matter to you. Write the criteria first, before proposals arrive. If you choose them afterward, you will pick headings that justify the vendor you already like, usually without noticing.

The matrix below is a sample. The weights serve as an example calculation only, so adjust them to your own priorities.

CriterionSample weightWhat you look at
Understanding of the need and proposed approach25%Does the proposal repeat the RFP or add insight?
Relevant experience20%Live projects of similar size with similar integrations
Team and project management15%Who does the work, communication rhythm, subcontractors
Technical capability and security15%Platform rationale, testing method, data protection
Post-launch support10%Warranty, maintenance, handover terms
Total cost15%Project fee together with several years of running costs

Each evaluator scores each criterion from one to five, and you multiply the score by the weight and add the results. Example calculation: a vendor that earns four out of five on approach collects twenty of the hundred available points from that criterion. Have evaluators score alone first and discuss afterward. Otherwise the most senior opinion leaks into every score sheet.

How much weight price deserves is your call, but do not make it the only criterion. The lowest bid has often priced the narrowest scope, so a low number alone proves little. Treat the matrix as a tool that organizes the discussion, not as a decision machine. When two vendors sit a few points apart, the presentation and the reference calls should settle it.

What proposal format should you ask vendors to follow?

If you do not prescribe a format, every vendor sends its own template, and you end up building the comparison table yourself. Hand vendors the skeleton instead:

  1. A summary of the need in the vendor's own words, plus the proposed approach.
  2. A scope table that marks each RFP feature as included, excluded, or optional.
  3. An itemized pricing table: discovery, design, development, content, integrations, testing, maintenance.
  4. A schedule that shows phases and the deliverables the vendor expects from you.
  5. The people who will actually work on the project, with their roles.
  6. Two or three projects of similar size, with reference contacts you may call.
  7. Assumptions, and the period during which the proposal remains valid.

The shared pricing table does the most work, because once you define the rows, placing three proposals next to each other takes little time. The assumptions section teaches you almost as much as the price, because it shows what the vendor found missing in your website RFP. Do not hesitate to set a page limit. A short, clear proposal tires you less than a thick brochure, and it also says more.

Reading the line items once proposals arrive is a separate skill. To catch hidden costs and missing items, follow the order of checks in our guide on how to evaluate a web design proposal.

How many vendors should receive your website RFP?

No official answer exists, so the range below reflects field experience as a starting point, not a rule. Three to five vendors is a balanced number for most corporate projects. Fewer than three does not give you a real comparison. More than five increases your evaluation workload and also lowers vendor effort, because nobody assigns their best team to a bid they will probably lose.

Send your website RFP to vendors you have screened, not to a random list. Screening does not need a long process. Look at live work first, then ask about experience at a similar scale and hold a short call. We collected the questions worth asking in 15 questions to screen a web design company.

It also helps to tell vendors how many competitors they face. You do not have to name them, because a line such as “we have invited four vendors” does the job. That openness shows vendors you run a serious process, and it also builds trust. If your current agency is on the list, say so as well. Otherwise the other vendors may suspect the outcome is already decided.

How do the Q&A period and selection process work?

After you send the website RFP, let vendors ask questions, and encourage them to do so. A vendor with no questions either skimmed the document or buried its assumptions in the price. One simple rule keeps the process fair: collect questions in writing until a fixed date, then send all answers to all vendors at the same time.

  1. Send the RFP to every vendor on the same day, with the same appendices.
  2. Open the question period and share the answers in one common document.
  3. Accept proposals on the due date, and state in advance how you will treat late ones.
  4. Have evaluators score independently.
  5. Invite the two or three highest-scoring vendors to present.
  6. Hold reference calls, then make the decision.
  7. Send a short, honest note of feedback to the vendors you did not choose.

Give vendors a reasonable window to prepare, because a deadline of only a few days attracts mostly those with a ready-made template. For the presentation, ask that the people who will actually do the work sit at the table. Meeting a sales team and then working with strangers is a common disappointment. Do not skip the last step either, because a vendor you turn down today may be the strongest candidate for your next project.

What are the most common website RFP mistakes?

We see the same mistakes again and again when we read RFPs. Good intentions sit behind most of them, but they still lower the quality of the proposals you receive.

  • Too much detail: prescribing everything from button colors to menu order leaves no room for vendor expertise. State the need, then let the bidder propose the solution.
  • Hiding the budget: a company that shares no range collects proposals that look nothing alike and often restarts the process.
  • Vague acceptance criteria: words such as fast, secure, and user friendly carry no measure. Name a test or a standard for each instead.
  • No out-of-scope list: every item you leave unsaid becomes a change request later.
  • Forgetting content: if nobody owns the copy, nobody owns the schedule either.
  • Copying another company's RFP: the document then describes their old needs instead of your goals.
  • Choosing on price alone: if you publish criteria and then pick the cheapest bid, vendors will put less care into your next request.

The acceptance mistake costs the most, because its effect shows up on handover day. For every expectation you write down, think about how you will test it at delivery. If you want a ready framework, our website handover and acceptance testing checklist shows which items you can tie to a measure. You can then carry the ones you choose into your website RFP as expectations.

Should you write the website RFP yourself or get help?

Most companies can write this document on their own. Goals, scope, content responsibility, timeline, and evaluation criteria are your knowledge, and no outsider knows them better. The template above and one or two internal meetings usually suffice for a mid-sized site. In that case, hiring a consultant is an unnecessary expense.

Outside help makes sense in three situations. Nobody in-house can write the technical section or judge the technical answers. Integrations form the core of the project. Or a past project ended in a scope dispute. An independent technical advisor, or a short paid discovery engagement, can then firm up the technical and acceptance sections. Watch for conflicts of interest, though. If the party that helps write the RFP will also bid, tell the other vendors openly.

At Talha Aslan and team, we have worked on projects that began with an RFP and on projects that began without one, and clarity has mattered more than length every time. If your document is ready and you would like to include us among the vendors you invite, our page on business website design explains how we work.

Frequently Asked Questions

How long should a website RFP be?
There is no fixed page count. The right length gives vendors enough clarity to price the same work. For a mid-sized corporate site, a core document of a few pages plus appendices usually does the job. Put the sitemap, brand guidelines, and integration documents in appendices, and keep the body to goals, scope, timeline, criteria, and response format.
Do you have to include a budget in a website RFP?
No, but we recommend it. Vendors without budget information guess the scope and send proposals that look nothing alike. If you prefer not to share an exact figure, state a range or a ceiling. Vendors will then propose the best solution inside that limit, and you can compare their answers far more easily.
What is the difference between an RFP, an RFI, and an RFQ?
An RFI is a request for information. You use it to learn what vendors can do before you define the project. An RFQ is a request for quotation, suitable when the specification is fixed and you only need a price. An RFP describes a need and asks for both an approach and a price, which fits most website projects.
How long does it take to write a website RFP?
It varies by company, and internal agreement drives the time more than writing does. A team that already agrees on goals, budget range, and content ownership can draft the document quickly. If those decisions remain open, close them first. Starting to write early only passes your unresolved questions on to the vendors.
What should you do if vendors do not respond to your RFP?
Ask them why, because most will tell you honestly. Common reasons include a very short deadline, an overly long document, an unclear budget, or too many invited bidders. Fix those points and reissue the request to a shorter list. For small projects, moving forward with a brief and direct conversations is also a valid route.
Does an RFP replace the contract?
No. The RFP states your expectations, the proposal states the vendor's answer, and the contract records the binding agreement between both parties. Many companies still attach the RFP and the accepted proposal to the contract as exhibits, so a written reference exists if scope questions arise. Ask your attorney to review the contract, since this article is not legal advice.
  • website rfp
  • request for proposal
  • rfp template
  • web design proposal
  • vendor selection
  • scoring matrix
  • corporate website
Share:
Talha Aslan

Google Partner digital marketing expert. Hands-on with SEO, Google Ads, web design and e-commerce projects since 2012; every post here comes from that experience.

Next project

Get a quote for your project.

Your brief goes straight to Talha Aslan and team: strategy led by Talha, delivery by an experienced team. We reply the same day and send the scope, timeline and price as a written quote within 1 business day.